This project involved the development of a new commercial area with a childcare centre, medical centre and a motel.
The Stormwater360 in-house design team worked closely with the consulting Engineer during the design stages to provide a cost-effective solution to meet the site constraints and consent conditions.
A VortCapture™ was installed to treat the carpark for gross pollutant removal and discharges into a downstream ChamberMaxx™ soakage system.