This project involved the development of a new bus servicing depot including a 2200m² new impervious hardstand.
Our in-house design team worked closely with the consulting engineers during the detailed design stage to provide appropriate devices to meet the specific site constraints and target contaminates.
A Stormwater360 API Oil/water separator was installed to remove hydrocarbons from the bus wash-down area.
Two StormFilter's™ vaults (with 5 cartridges and forebays) were installed to treat Total Suspended Solids (TSS) and heavy metals.